OO9 is 4mm to the foot scale (that is OO or 1/76) but using 9mm track gauge (the same size as N gauge). This is...
The TOPS system (Total Operations Processing System) is a computerised system used to keep track of a locomotive/rolling stock's location and servicing requirements. TOPS was developed in America to enable the railways to track their rolling stock...